End-to-End Design and Delivery
From initial design through to delivery and installation, NPS GRP can manage the entire process for our GRP enclosures and GRP kiosks. Our experienced teams are ready to deploy across the UK to ensure seamless project execution.





Installation and Key Features
Our DNO-approved substations feature certified explosion relief and are easily installed onto a customer-provided concrete plinth. They come with a variety of locking options, including dual locking suitable for IDNO applications. The enclosures shown above demonstrate our versatility: we can provide an integrated low voltage enclosure or, as in this example, a separate one for the customer side.
Customisation and High Security Compliance
All units can, if required, incorporate bespoke brick or stone finishes to align with local planning requirements. Our DNO high security kiosks meet the stringent LPCB LPS 1175 Issue 8 standards, delivering robust protection for critical national infrastructure, including applications in the UK water industry and other utilities.